White Operations

Spur Lines Express
Tommy White
Terrell
HO
29' x 24'

Spur Lines time frame is during the transition period from steam to diesel. The layout has approximately 250 feet of main line with 133 Fast Tracks hand built turnouts. All turnouts are powered by tortoise switch machines. The railroad is under construction with all the track work completed and 40% of the scenery completed. The layout is designed for operation and for the most part, follows typical railroad operation.

We have 3 industrial yards plus 11 towns with lots of switching.

7, 3 Yardmasters, 4 Road Engineers

The layout is DCC powered by Digitrax. For throttles we use UT4Rs. The JMRI program is used to schedule trains, print manifests and switch lists.

Theme provided by Danetsoft under GPL license from Danang Probo Sayekti